Mena Improvements (Various Streets)
City: Mena |
* City Population: 5,737 |
County: Polk |
Project Status: Requested |
Request Date: January 08, 2021 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Crossett Overlay 3 (Various Streets)
City: Crossett |
* City Population: 5,507 |
County: Ashley |
Project Status: Requested |
Request Date: January 04, 2021 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Austin Overlay (Various Streets)
City: Austin |
* City Population: 2,038 |
County: Lonoke |
Project Status: Requested |
Request Date: January 08, 2021 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Atkins Overlay 2 (Various Streets)
City: Atkins |
* City Population: 3,016 |
County: Pope |
Project Status: Requested |
Request Date: January 04, 2021 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Beedeville Overlay (Various Streets)
City: Beedeville |
* City Population: 107 |
County: Jackson |
Project Status: Requested |
Request Date: December 21, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Tyronza Overlay 2 (Various Streets)
City: Tyronza |
* City Population: 762 |
County: Poinsett |
Project Status: Requested |
Request Date: November 30, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Sulphur Springs Overlay & Surfacing (Various Streets)
City: Sulphur Springs |
* City Population: 511 |
County: Benton |
Project Status: Requested |
Request Date: November 30, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Lavaca Overlay 2 (Various Streets)
City: Lavaca |
* City Population: 2,289 |
County: Sebastian |
Project Status: Requested |
Request Date: December 14, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): 5.00 |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
La Grange Surfacing (Various Streets)
City: La Grange |
* City Population: 89 |
County: Lee |
Project Status: Requested |
Request Date: November 16, 2020 |
On-Site Assessment Date: December 01, 2020 |
Approval Date: |
Approved Amount: |
Project Length (Miles): 1.06 |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Hot Springs Overlay (Various Streets)
City: Hot Springs |
* City Population: 35,193 |
County: Garland |
Project Status: Requested |
Request Date: October 30, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Holly Grove Overlay & Surfacing (Various Streets)
City: Holly Grove |
* City Population: 602 |
County: Monroe |
Project Status: Requested |
Request Date: December 03, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Hazen Overlay 3 (Various Streets)
City: Hazen |
* City Population: 1,468 |
County: Prairie |
Project Status: Requested |
Request Date: November 12, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
DeWitt Overlay (Various Streets)
City: DeWitt |
* City Population: 3,292 |
County: Arkansas |
Project Status: Requested |
Request Date: November 16, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Lake Dr. & Union St. Overlay
City: Wilson |
* City Population: 903 |
County: Mississippi |
Project Status: Requested |
Request Date: October 21, 2020 |
On-Site Assessment Date: November 12, 2020 |
Approval Date: |
Approved Amount: |
Project Length (Miles): 1.34 |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Oak Grove Surfacing (Various Streets)
City: Oak Grove |
* City Population: 369 |
County: Carroll |
Project Status: Requested |
Request Date: October 19, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Marshall Overlay 3 (Various Streets)
City: Marshall |
* City Population: 1,355 |
County: Searcy |
Project Status: Requested |
Request Date: October 01, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Marianna Overlay 3 (Various Streets)
City: Marianna |
* City Population: 4,115 |
County: Lee |
Project Status: Requested |
Request Date: October 22, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Moorefield Overlay & Surfacing (Various Streets)
City: Moorefield |
* City Population: 137 |
County: Independence |
Project Status: Requested |
Request Date: September 23, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Hoxie Overlay 3 (Various Streets)
City: Hoxie |
* City Population: 2,780 |
County: Lawrence |
Project Status: Requested |
Request Date: September 08, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Hickory Ridge Overlay (Various Streets)
City: Hickory Ridge |
* City Population: 272 |
County: Cross |
Project Status: Requested |
Request Date: September 14, 2020 |
On-Site Assessment Date: October 07, 2020 |
Approval Date: |
Approved Amount: |
Project Length (Miles): 1.88 |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Gentry Overlay (Various Streets)
City: Gentry |
* City Population: 3,158 |
County: Benton |
Project Status: Requested |
Request Date: September 17, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): 1.73 |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Southside Overlay No. 2 (Various Streets)
City: Southside |
* City Population: 3,901 |
County: Independence |
Project Status: Requested |
Request Date: August 07, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): 2.50 |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Pea Ridge Overlay & Surfacing (Various Streets)
City: Pea Ridge |
* City Population: 4,794 |
County: Benton |
Project Status: Requested |
Request Date: August 21, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Patmos Overlay & Surfacing (Various Streets)
City: Patmos |
* City Population: 64 |
County: Hempstead |
Project Status: Requested |
Request Date: August 14, 2020 |
On-Site Assessment Date: August 20, 2020 |
Approval Date: |
Approved Amount: |
Project Length (Miles): 0.62 |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Lafe Overlay & Surfacing (Various Streets)
City: Lafe |
* City Population: 458 |
County: Greene |
Project Status: Requested |
Request Date: August 11, 2020 |
On-Site Assessment Date: August 25, 2020 |
Approval Date: |
Approved Amount: |
Project Length (Miles): 1.56 |
Job Number: |
Total Contract Length (Miles): 1.56 |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Dyer Overlay No. 2 (Various Streets)
City: Dyer |
* City Population: 876 |
County: Crawford |
Project Status: Requested |
Request Date: August 17, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Datto Overlay (Various Streets)
City: Datto |
* City Population: 100 |
County: Clay |
Project Status: Requested |
Request Date: August 17, 2020 |
On-Site Assessment Date: August 25, 2020 |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): 1.82 |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Batesville Overlay 3 (Various Streets)
City: Batesville |
* City Population: 10,248 |
County: Independence |
Project Status: Requested |
Request Date: August 19, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
West Memphis Improvements (Various Streets)
City: West Memphis |
* City Population: 26,245 |
County: Crittenden |
Project Status: Requested |
Request Date: June 15, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Springdale Overlay (Various Streets)
City: Springdale |
* City Population: 69,797 |
County: Washington |
Project Status: Requested |
Request Date: July 30, 2020 |
On-Site Assessment Date: September 25, 2020 |
Approval Date: |
Approved Amount: |
Project Length (Miles): 1.99 |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Siloam Springs Overlay (Various Streets)
City: Siloam Springs |
* City Population: 15,039 |
County: Benton |
Project Status: Requested |
Request Date: July 15, 2020 |
On-Site Assessment Date: October 23, 2020 |
Approval Date: |
Approved Amount: |
Project Length (Miles): 1.40 |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Portland Overlay No. 2 (Various Streets)
City: Portland |
* City Population: 430 |
County: Ashley |
Project Status: Requested |
Request Date: July 20, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Melbourne Overlay No. 2 (Various Streets)
City: Melbourne |
* City Population: 1,848 |
County: Izard |
Project Status: Requested |
Request Date: July 17, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Lake City Overlay No. 2 (Various Streets)
City: Lake City |
* City Population: 2,082 |
County: Craighead |
Project Status: Requested |
Request Date: June 12, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Fulton Overlay & Surfacing (Various Streets)
City: Fulton |
* City Population: 201 |
County: Hempstead |
Project Status: Requested |
Request Date: July 15, 2020 |
On-Site Assessment Date: July 23, 2020 |
Approval Date: |
Approved Amount: |
Project Length (Miles): 1.09 |
Job Number: |
Total Contract Length (Miles): 1.09 |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Fairfield Bay Overlay (Various Streets)
City: Fairfield Bay |
* City Population: 2,338 |
County: Van Buren |
Project Status: Requested |
Request Date: June 19, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Elkins Overlay (Various Streets)
City: Elkins |
* City Population: 2,648 |
County: Washington |
Project Status: Requested |
Request Date: June 25, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Caraway Overlay & Surfacing (Various Streets)
City: Caraway |
* City Population: 1,279 |
County: Craighead |
Project Status: Requested |
Request Date: June 15, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Tupelo Overlay No. 2 (Various Streets)
City: Tupelo |
* City Population: 180 |
County: Jackson |
Project Status: Requested |
Request Date: June 03, 2020 |
On-Site Assessment Date: December 09, 2020 |
Approval Date: |
Approved Amount: |
Project Length (Miles): 0.48 |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Hughes Overlay No. 2 (Various Streets)
City: Hughes |
* City Population: 1,441 |
County: St. Francis |
Project Status: Requested |
Request Date: June 03, 2020 |
On-Site Assessment Date: August 12, 2020 |
Approval Date: |
Approved Amount: |
Project Length (Miles): 1.54 |
Job Number: |
Total Contract Length (Miles): 1.54 |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Trumann Overlay No. 2 (Various Streets)
City: Trumann |
* City Population: 7,296 |
County: Poinsett |
Project Status: Requested |
Request Date: November 21, 2019 |
On-Site Assessment Date: April 14, 2020 |
Approval Date: |
Approved Amount: |
Project Length (Miles): 1.91 |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Texarkana Overlay (Various Streets)
City: Texarkana |
* City Population: 29,919 |
County: Miller |
Project Status: Requested |
Request Date: November 06, 2019 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Stamps Overlay 3 (Various Streets)
City: Stamps |
* City Population: 1,693 |
County: Lafayette |
Project Status: Requested |
Request Date: January 10, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Shannon Hills Overlay No. 3 (Various Streets)
City: Shannon Hills |
* City Population: 3,143 |
County: Saline |
Project Status: Requested |
Request Date: March 18, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Salesville Overlay & Surfacing No. 2 (Various Streets)
City: Salesville |
* City Population: 450 |
County: Baxter |
Project Status: Requested |
Request Date: February 24, 2020 |
On-Site Assessment Date: September 08, 2020 |
Approval Date: |
Approved Amount: |
Project Length (Miles): 1.86 |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Prairie Grove Overlay No. 2 (Various Streets)
City: Prairie Grove |
* City Population: 4,380 |
County: Washington |
Project Status: Requested |
Request Date: November 22, 2019 |
On-Site Assessment Date: October 23, 2020 |
Approval Date: |
Approved Amount: |
Project Length (Miles): 1.90 |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Powhatan Overlay No. 2 (Various Streets)
City: Powhatan |
* City Population: 72 |
County: Lawrence |
Project Status: Requested |
Request Date: February 18, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Pocahontas Overlay 3 (Various Streets)
City: Pocahontas |
* City Population: 6,608 |
County: Randolph |
Project Status: Requested |
Request Date: January 03, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): 2.05 |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Pineville Overlay and Surfacing (Various Streets)
City: Pineville |
* City Population: 238 |
County: Izard |
Project Status: Requested |
Request Date: February 24, 2020 |
On-Site Assessment Date: September 08, 2020 |
Approval Date: |
Approved Amount: |
Project Length (Miles): 2.89 |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Piggott Overlay & Surfacing (Various Streets)
City: Piggott |
* City Population: 3,849 |
County: Clay |
Project Status: Requested |
Request Date: February 24, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Peach Orchard Overlay No. 2 (Various Streets)
City: Peach Orchard |
* City Population: 135 |
County: Clay |
Project Status: Requested |
Request Date: February 12, 2020 |
On-Site Assessment Date: August 04, 2020 |
Approval Date: |
Approved Amount: |
Project Length (Miles): 1.32 |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Mulberry Overlay No. 2 (Various Streets)
City: Mulberry |
* City Population: 1,655 |
County: Crawford |
Project Status: Requested |
Request Date: December 30, 2019 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
McCrory Overlay 3 (Various Streets)
City: McCrory |
* City Population: 1,729 |
County: Woodruff |
Project Status: Requested |
Request Date: October 29, 2019 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Lockesburg Overlay No. 2 (Various Streets)
City: Lockesburg |
* City Population: 739 |
County: Sevier |
Project Status: Requested |
Request Date: December 26, 2019 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Leachville Overlay & Surfacing (Various Streets)
City: Leachville |
* City Population: 1,993 |
County: Mississippi |
Project Status: Requested |
Request Date: December 30, 2019 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Lamar Overlay & Surfacing (Various Streets)
City: Lamar |
* City Population: 1,605 |
County: Johnson |
Project Status: Requested |
Request Date: March 27, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Lake Village Overlay No. 2 (Various Streets)
City: Lake Village |
* City Population: 2,575 |
County: Chicot |
Project Status: Requested |
Request Date: February 05, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Knoxville Overlay (Various Streets)
City: Knoxville |
* City Population: 731 |
County: Johnson |
Project Status: Requested |
Request Date: January 29, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Hunter Overlay and Surfacing (Various Streets)
City: Hunter |
* City Population: 105 |
County: Woodruff |
Project Status: Requested |
Request Date: May 20, 2020 |
On-Site Assessment Date: July 23, 2020 |
Approval Date: |
Approved Amount: |
Project Length (Miles): 1.97 |
Job Number: |
Total Contract Length (Miles): 1.97 |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Horseshoe Bend Overlay (Various Streets)
City: Horseshoe Bend |
* City Population: 2,184 |
County: Izard |
Project Status: Requested |
Request Date: January 17, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Horatio Overlay No. 2 (Various Streets)
City: Horatio |
* City Population: 1,044 |
County: Sevier |
Project Status: Requested |
Request Date: January 27, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Highland Overlay & Surfacing (Various Streets)
City: Highland |
* City Population: 1,045 |
County: Sharp |
Project Status: Requested |
Request Date: January 29, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Higginson Overlay (Various Streets)
City: Higginson |
* City Population: 621 |
County: White |
Project Status: Requested |
Request Date: December 16, 2019 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Hector Overlay (Various Streets)
City: Hector |
* City Population: 450 |
County: Pope |
Project Status: Requested |
Request Date: January 06, 2020 |
On-Site Assessment Date: August 14, 2020 |
Approval Date: |
Approved Amount: |
Project Length (Miles): 2.62 |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Greenway Overlay (Various Streets)
City: Greenway |
* City Population: 209 |
County: Clay |
Project Status: Requested |
Request Date: February 14, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Goshen Overlay & Surfacing (Various Streets)
City: Goshen |
* City Population: 1,071 |
County: Washington |
Project Status: Requested |
Request Date: January 13, 2020 |
On-Site Assessment Date: September 18, 2020 |
Approval Date: |
Approved Amount: |
Project Length (Miles): 2.01 |
Job Number: |
Total Contract Length (Miles): 2.01 |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Gilmore Overlay (Various Streets)
City: Gilmore |
* City Population: 263 |
County: Crittenden |
Project Status: Requested |
Request Date: January 27, 2020 |
On-Site Assessment Date: September 09, 2020 |
Approval Date: |
Approved Amount: |
Project Length (Miles): 0.90 |
Job Number: |
Total Contract Length (Miles): 0.90 |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Gillham Overlay No. 2 (Various Streets)
City: Gillham |
* City Population: 160 |
County: Sevier |
Project Status: Requested |
Request Date: January 08, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Gateway Surfacing (Various Streets)
City: Gateway |
* City Population: 405 |
County: Benton |
Project Status: Requested |
Request Date: January 06, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Friendship Overlay & Surfacing (Various Streets)
City: Friendship |
* City Population: 176 |
County: Hot Spring |
Project Status: Requested |
Request Date: December 02, 2019 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Farmington Overlay (Various Streets)
City: Farmington |
* City Population: 5,974 |
County: Washington |
Project Status: Requested |
Request Date: March 17, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Eudora Overlay (Various Streets)
City: Eudora |
* City Population: 2,269 |
County: Chicot |
Project Status: Requested |
Request Date: January 31, 2020 |
On-Site Assessment Date: March 05, 2020 |
Approval Date: |
Approved Amount: |
Project Length (Miles): 1.46 |
Job Number: |
Total Contract Length (Miles): 1.46 |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Etowah Surfacing No. 2 (Various Streets)
City: Etowah |
* City Population: 351 |
County: Mississippi |
Project Status: Requested |
Request Date: January 29, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
England Overlay No. 2 (Various Streets)
City: England |
* City Population: 2,825 |
County: Lonoke |
Project Status: Requested |
Request Date: January 30, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Diaz Overlay (Various Streets)
City: Diaz |
* City Population: 1,318 |
County: Jackson |
Project Status: Requested |
Request Date: November 14, 2019 |
On-Site Assessment Date: July 23, 2020 |
Approval Date: |
Approved Amount: |
Project Length (Miles): 1.99 |
Job Number: |
Total Contract Length (Miles): 1.99 |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Centerton Overlay & Surfacing (Various Streets)
City: Centerton |
* City Population: 9,515 |
County: Benton |
Project Status: Requested |
Request Date: November 26, 2019 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Calico Rock Overlay 3 (Various Streets)
City: Calico Rock |
* City Population: 1,545 |
County: Izard |
Project Status: Requested |
Request Date: January 08, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Briarcliff Overlay No. 2 (Various Streets)
City: Briarcliff |
* City Population: 236 |
County: Baxter |
Project Status: Requested |
Request Date: February 21, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Bono Overlay No. 2 (Various Streets)
City: Bono |
* City Population: 2,131 |
County: Craighead |
Project Status: Requested |
Request Date: February 06, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Black Oak Overlay & Surfacing (Various Streets)
City: Black Oak |
* City Population: 262 |
County: Craighead |
Project Status: Requested |
Request Date: December 26, 2019 |
On-Site Assessment Date: March 10, 2020 |
Approval Date: |
Approved Amount: |
Project Length (Miles): 0.97 |
Job Number: |
Total Contract Length (Miles): 0.97 |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Bigelow Overlay 3 (Various Streets)
City: Bigelow |
* City Population: 315 |
County: Perry |
Project Status: Requested |
Request Date: January 17, 2020 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Bauxite Overlay (Various Streets)
City: Bauxite |
* City Population: 487 |
County: Saline |
Project Status: Requested |
Request Date: March 09, 2020 |
On-Site Assessment Date: July 29, 2020 |
Approval Date: |
Approved Amount: |
Project Length (Miles): 2.00 |
Job Number: |
Total Contract Length (Miles): 2.00 |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Brookland Eason St. & School St. Overlay
City: Brookland |
* City Population: 1,642 |
County: Craighead |
Project Status: Complete |
Request Date: August 28, 2019 |
On-Site Assessment Date: October 30, 2019 |
Approval Date: February 12, 2020 |
Approved Amount: $300000.00 |
Project Length (Miles): 1.59 |
Job Number: C16009 |
Total Contract Length (Miles): 1.59 |
Contract Name: Brookland Eason St. & School St. Overlay (S) |
Letting Date: June 24, 2020 |
Contractor: |
Amount of Contract: $224387.53 |
Wilmar 7th St. Bridge Replacement
City: Wilmar |
* City Population: 511 |
County: Drew |
Project Status: Approved for Design Only |
Request Date: October 15, 2019 |
On-Site Assessment Date: March 19, 2019 |
Approval Date: February 12, 2020 |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Hermitage Overlay & Surfacing (Various Streets)
City: Hermitage |
* City Population: 830 |
County: Bradley |
Project Status: Requested |
Request Date: October 08, 2019 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Bearden Overlay No. 2 (Various Streets)
City: Bearden |
* City Population: 966 |
County: Ouachita |
Project Status: Requested |
Request Date: October 17, 2019 |
On-Site Assessment Date: November 05, 2020 |
Approval Date: |
Approved Amount: |
Project Length (Miles): 1.45 |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Pangburn Overlay No. 2 (Various Streets)
City: Pangburn |
* City Population: 601 |
County: White |
Project Status: Requested |
Request Date: August 29, 2019 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Monticello Overlay 2 (Various Streets)
City: Monticello |
* City Population: 9,467 |
County: Drew |
Project Status: Complete |
Request Date: August 21, 2019 |
On-Site Assessment Date: September 05, 2019 |
Approval Date: February 12, 2020 |
Approved Amount: $299073.60 |
Project Length (Miles): 1.36 |
Job Number: C22004 |
Total Contract Length (Miles): 1.36 |
Contract Name: Monticello Overlay (S) |
Letting Date: May 13, 2020 |
Contractor: |
Amount of Contract: $264851.44 |
Hot Springs Honeycut St. Bridge Replacement
City: Hot Springs |
* City Population: 35,193 |
County: Garland |
Project Status: Approved for Design Only |
Request Date: August 29, 2019 |
On-Site Assessment Date: August 22, 2019 |
Approval Date: February 12, 2020 |
Approved Amount: |
Project Length (Miles): |
Job Number: C26005 |
Total Contract Length (Miles): |
Contract Name: Gulpha Creek Str. & Apprs. (Hot Springs) (S) |
Letting Date: |
Contractor: |
Amount of Contract: |
Enola Overlay (Various Streets)
City: Enola |
* City Population: 338 |
County: Faulkner |
Project Status: Requested |
Request Date: September 30, 2019 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Banks Overlay & Surfacing (Various Streets)
City: Banks |
* City Population: 124 |
County: Bradley |
Project Status: Requested |
Request Date: September 01, 2019 |
On-Site Assessment Date: February 18, 2020 |
Approval Date: |
Approved Amount: |
Project Length (Miles): 1.04 |
Job Number: |
Total Contract Length (Miles): 1.04 |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Ward Overlay No. 2 (Various Streets)
City: Ward |
* City Population: 4,067 |
County: Lonoke |
Project Status: Requested |
Request Date: July 19, 2019 |
On-Site Assessment Date: April 07, 2020 |
Approval Date: |
Approved Amount: |
Project Length (Miles): 1.64 |
Job Number: |
Total Contract Length (Miles): 1.64 |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Walnut Ridge Overlay 3 (Various Streets)
City: Walnut Ridge |
* City Population: 4,890 |
County: Lawrence |
Project Status: Requested |
Request Date: July 24, 2019 |
On-Site Assessment Date: |
Approval Date: |
Approved Amount: |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Jacksonport Overlay and Surfacing (Various Streets)
City: Jacksonport |
* City Population: 212 |
County: Jackson |
Project Status: Requested |
Request Date: July 08, 2019 |
On-Site Assessment Date: November 05, 2020 |
Approval Date: |
Approved Amount: |
Project Length (Miles): 0.53 |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Fountain Hill Overlay & Surfacing (Various Streets)
City: Fountain Hill |
* City Population: 175 |
County: Ashley |
Project Status: Complete |
Request Date: July 16, 2019 |
On-Site Assessment Date: September 05, 2019 |
Approval Date: February 12, 2020 |
Approved Amount: $285962.13 |
Project Length (Miles): 0.82 |
Job Number: C02008 |
Total Contract Length (Miles): 2.34 |
Contract Name: Parkdale & Fountain Hill Overlay & Surfacing (S) |
Letting Date: May 13, 2020 |
Contractor: |
Amount of Contract: $280822.31 |
Dyess Overlay No. 2 (Various Streets)
City: Dyess |
* City Population: 410 |
County: Mississippi |
Project Status: Requested |
Request Date: March 29, 2016 |
On-Site Assessment Date: January 20, 2020 |
Approval Date: |
Approved Amount: |
Project Length (Miles): 8.00 |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Carthage Overlay & Surfacing (S)
City: Carthage |
* City Population: 343 |
County: Dallas |
Project Status: Requested |
Request Date: August 12, 2019 |
On-Site Assessment Date: March 12, 2020 |
Approval Date: |
Approved Amount: |
Project Length (Miles): 1.34 |
Job Number: |
Total Contract Length (Miles): 1.34 |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Brinkley Overlay 2 (Various Streets)
City: Brinkley |
* City Population: 3,188 |
County: Monroe |
Project Status: Approved for Construction Funding |
Request Date: July 19, 2019 |
On-Site Assessment Date: September 24, 2019 |
Approval Date: February 12, 2020 |
Approved Amount: $300000.00 |
Project Length (Miles): |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Bald Knob Overlay No. 2 (Various Streets)
City: Bald Knob |
* City Population: 2,897 |
County: White |
Project Status: Approved for Construction Funding |
Request Date: July 19, 2019 |
On-Site Assessment Date: September 12, 2019 |
Approval Date: February 12, 2020 |
Approved Amount: $300000.00 |
Project Length (Miles): 2.53 |
Job Number: |
Total Contract Length (Miles): 2.53 |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
Weiner Overlay No. 2 (Various Streets)
City: Weiner |
* City Population: 716 |
County: Poinsett |
Project Status: Requested |
Request Date: June 20, 2019 |
On-Site Assessment Date: August 04, 2020 |
Approval Date: |
Approved Amount: |
Project Length (Miles): 1.65 |
Job Number: |
Total Contract Length (Miles): |
Contract Name: |
Letting Date: |
Contractor: |
Amount of Contract: |
*City Population Derived from 2010 census statistics.